DAILY MAINTENANCE AND REQUIREMENTS OF OIL-IMMERSED POWER TRANSFORMER ON-LOAD TAP-CHANGER
1. Before the on-load tap-changer is put into operation, it should be checked whether the oil level is normal, there is no oil leakage, and the control box should be well-proofed from moisture.
2. After the newly commissioned on-load tap-changer gas relay is installed, the operator should release...
LEARN MORE